Table of Major Projects in Offshore Engineering
| No. | Clients | Project Name | Work Details | Start Date | Completion Date |
| 69 | Shanghai Zhenhua Heavy Industries (Group) Co., Ltd. | Lifting Engineering Services for the Fanshi II Offshore Substation Project Using ZHENHUA 30 Vessel | Lifting Works for the Fanshi II Offshore Substation Project | May 2026 | May 2026 |
| 68 | State Power Investment Corporation (SPIC) | Centralized Rectification Project for Hidden Hazards at the Cihai Offshore Wind Farm Onshore Switching Station | Centralized Rectification of Hidden Hazards at the Cihai Offshore Wind Farm Onshore Switching Station | May 2026 | - |
| 67 | SPIC Jieyang Qianzhan Wind Power Co., Ltd. | Fire Door Replacement in the Air Conditioning Room of the Distribution Building | Fire Door Replacement in the Air Conditioning Room of the Distribution Building at Jieyang Qianzhan Wind Farm Site | November 2025 | November 2025 |
| 66 | Huadian Heavy Industries Co., Ltd. | Main Structure Inspection Project for Wind Turbines at the Puti Offshore Wind Farm | Rental Equipment: 3D Laser Scanning System, including Scanner, Data Collector, Tripod, and Data Processing Workstation (with Data Processing Software). | September 2025 | December 2025 |
| 65 | Huadian Heavy Industries Co., Ltd. | State Power Investment Jieyang Marine Ranch Leg-type (Truss-type) Heavy Cage Test Project | Offshore Installation and Construction of Leg-type (Truss-type) Heavy Cages for Marine Ranch | August 2025 | September 2025 |
| 64 | Yantai Salvage Bureau | Offshore Wind Power Project Construction Labor Service of Yantai Salvage Bureau | Wind Turbine Foundation Fabrication and Construction, Wind Turbine Hoisting and Offshore Substation Construction | June 2025 | - |
| 63 | Guangzhou Salvage Bureau | Engineering Construction Labor Subcontract | Engineering Construction Labor | April 2025 | |
| 62 | Guangzhou Salvage Bureau | Processing Service Contract for Tooling Cylinders of "Lan Kun 01" Wind Turbine Installation Base | Tooling Cylinder Processing Service | May 2025 | June 2025 |
| 61 | Jingdezhen Haijian Shipping Co., Ltd. | Construction Service Contract for Pile Gripper Offshore Binding, Welding and Fixing Work | Construction of Pile Gripper Offshore Binding, Welding and Fixing Work | May 2025 | June 2025 |
| 60 | Xiamen Branch of CCCC Third Harbor Engineering Co., Ltd. | Labor Subcontract Agreement | Foundation Construction of CGN Yangjiang Fanshi No.1 Offshore Wind Farm | April 2025 | May 2025 |
| 59 | Huadian (Yangjiang) Offshore Wind Power Operation and Maintenance Co., Ltd. | Construction Labor Service Contract | Yangjiang Station and Sea Sweeping Labor Service | April 2025 | |
| 58 | Zhongtian Technology Group Marine Engineering Co., Ltd. | Labor Outsourcing Contract | Labor Outsourcing for Wind Turbine and Foundation Construction | April 2025 | |
| 57 | Guangdong Branch of Huadian Technology & Engineering Co., Ltd. | PCM Supply, Construction and Management Labor Contract for Jacket Foundation Construction of Section I of CGN Yangjiang Fanshi No.1 Offshore Wind Farm Foundation Prefabrication and Wind Turbine Installation Project | Jacket Foundation Construction of CGN Yangjiang Fanshi No.1 Offshore Wind Farm | December 2024 | May 2025 |
| 56 | Huadian Heavy Industries Co., Ltd. | Test Pile Construction Labor for General Contracting Project of Huadian Yangjiang Sanshandao No.6 Offshore Wind Farm Project EPC General Contract | Test Pile Construction of Wind Turbine Foundation for Sanshandao No.6 Offshore Wind Farm Project | November 2024 | January 2025 |
| 55 | Huadian (Yangjiang) Offshore Wind Power Operation and Maintenance Co., Ltd. | Huadian CIMC 01 Construction Machinery Operator Service for Wind Turbine Foundation Construction Vessel and Equipment Rental Project of Qingzhou Wind Power Project of China Railway Major Bridge Engineering Group Fifth Engineering Co., Ltd. | Wind Turbine Foundation Construction of Qingzhou Wind Power Project | April 2024 | October 2024 |
| 54 | YOFC Baosheng Marine Engineering Co., Ltd. | Framework Agreement for Labor Outsourcing Service of "ChangshengMay000" | Single Pile Foundation Construction of Datang Nan'ao Lemen Project | August 2024 | January 2025 |
| 53 | Yantai Salvage Bureau | Wind Turbine Installation Labor Service Contract for Shandong Peninsula South Offshore Wind Power Project | Wind Turbine Installation Labor | July 2024 | - |
| 52 | Guangzhou Salvage Bureau | Offshore Wind Turbine Installation Labor Subcontract | Construction Labor for "Lan Kun 01" Wind Turbine Installation Platform | July 2024 | - |
| 51 | Yantai Salvage Bureau | Offshore Final Hoisting Labor Service Contract for CEPA Jacket of Bozhong 26-6 Oilfield Development (Phase I) Project | Offshore Final Hoisting Labor for CEPA Jacket | March 2024 | July 2024 |
| 50 | Yantai Salvage Bureau | Pile Driving, Substation and Wind Turbine Installation Labor Subcontract for Wind Turbine Foundation Fabrication and Construction, Wind Turbine Hoisting and Offshore Substation Construction Project (Package A) of Shandong Energy Bozhong Offshore Wind Power G Site Project EPC General Contract | Wind Turbine Foundation Fabrication and Construction, Wind Turbine Hoisting and Offshore Substation Construction | December 2023 | - |
| 49 | Yantai Salvage Bureau | Pile Driving and Wind Turbine Installation Labor Service Contract for General Contracting Project of Shandong Energy Bozhong Offshore Wind Power G Site Project | November 2023 | October 2024 | |
| 48 | Shanghai Boqiang Heavy Industry Co., Ltd. | UT Inspection and High Strain Testing Project of Pile Top Flange for Huadian Yuhuan Wind Power Project | UT Inspection and High Strain Testing of Pile Top Flange | November 2023 | December 2023 |
| 47 | Shanghai Boqiang Heavy Industry Co., Ltd. | Welder Labor for Jacket and Block Installation Project of Daishan No.1 Wind Farm | Welder Labor for Jacket and Block Installation Project | November 2023 | December 2023 |
| 46 | YOFC Baosheng Marine Engineering Co., Ltd. | "ChangshengDecember00" - Bailey Frame Installation Contract | Bailey Frame Installation | October 2023 | October 2023 |
| 45 | YOFC Baosheng Marine Engineering Co., Ltd. | Labor Subcontract for Installation ofOctober GoldwindAugust.5MW Wind Turbines of Three Gorges New Energy Muping Offshore Wind Power Project of "ChangshengDecember00" Wind Power Installation Vessel | Installation ofOctober GoldwindAugust.5MW Wind Turbines of Three Gorges New Energy Muping Offshore Wind Power Project | August 2023 | November 2023 |
| 44 | Huadian Heavy Industry Co., Ltd. | Jacket Foundation Construction Service Project of Longyuan Zhenhua Yangjiang Qingzhou Sea Area | Installation of 2 Substation Jackets | August 2023 | August 2023 |
| 43 | Huadian Heavy Industry Co., Ltd. | Jacket Foundation Construction Labor Service Project for Pipe Pile Driving Construction of Jacket Foundation of Section II of CGN Huizhou Port No.2 Offshore Wind Power Project Foundation Prefabrication and Wind Turbine Installation Integration | Pipe Pile Driving Construction ofDecember Jacket Foundations | August 2023 | August 2023 |
| 42 | Huadian Heavy Industry Co., Ltd. | Substation Jacket Foundation Construction Labor Service for IHC-S3600 Hydraulic Pile Hammer Substation Jacket Pipe Pile Driving Construction Project of Huizhou Port No.2 | Installation ofJanuary Substation Jacket | November 2023 | November 2023 |
| 41 | YOFC Baosheng Marine Engineering Co., Ltd. | "ChangshengDecember00" Construction Personnel Outsourcing Service Contract | Construction Labor Dispatch | July 2023 | November 2023 |
| 40 | Nanjing Anvis Transmission Technology Co., Ltd. | Gearbox Maintenance Technical Service Agreement | Gearbox Replacement | June 2023 | November 2024 |
| 39 | Nantong Runbang Marine Engineering Equipment Co., Ltd. | Huadian Positioning Frame Material Supply Contract | Material Supply | May 2023 | May 2023 |
| 38 | Guangzhou Salvage Bureau | Engineering Construction Labor Subcontract | Offshore Constructiion Labor | April 2023 | April 2025 |
| 37 | Huadian Heavy Industry Co., Ltd. | Framework Procurement of Wind Turbine Foundation Installation Construction Labor for 2023-2024 Offshore Wind Power Projects | Framework of Wind Turbine Foundation Installation Construction Labor | March 2023 | April 2024 |
| 36 | Yantai Salvage Bureau | Pile Driving and Wind Turbine Installation Labor Service Contract for Shandong Sea Area Offshore Wind Power Project | Wind Turbine Installation and Single Pile Foundation Construction | April 2023 | November 2023 |
| 35 | Yantai Salvage Bureau | Spider Man Construction Service Contract for Shanneng Bozhong A33 Blade Disposal Project | Spider Man Labor Service | April 2023 | April 2023 |
| 34 | Huadian Heavy Industry Co., Ltd. | Section I of CGN Yangjiang Fanshi No.1 Offshore Wind Farm Foundation Prefabrication and Wind Turbine Installation Project | 22 Sets of Jacket Foundations and Installation | March 2023 | March 2024 |
| 33 | Huadian Heavy Industry Co., Ltd. | H590 Floating Photovoltaic Platform Hoisting, Launching and Offshore Transportation Installation Project | Hoisting, Launching and Offshore Transportation Installation of Floating Photovoltaic Platform | April 2023 | June 2023 |
| 32 | Yantai Salvage Bureau | State Power Investment Peninsula South U Site Offshore Wind Power Project | Wind Turbine Installation (36 Wind Turbines) | March 2023 | November 2023 |
| 31 | Yantai Salvage Bureau | State Power Investment Peninsula South U Site Offshore Wind Power Project | Single Pile Foundation Construction and Auxiliary Structure Installation; Steel Pile Turning, Pile Driving, etc. (18 Single Piles) | March 2023 | November 2023 |
| 30 | YOFC Baosheng Marine Engineering Co., Ltd. | Framework Agreement for Construction Outsourcing Service of "ChangshengMay000" Vessel | Construction Labor Subcontract for "ChangshengMay000" Vessel | March 2023 | November 2023 |
| 29 | Yantai Salvage Bureau | Wind Turbine Installation Labor Service Contract for Offshore Main Construction of Shandong Guohua Bozhong B2 Site Offshore Wind Power Project | Wind Turbine Installation | March 2023 | May 2023 |
| 28 | Yantai Salvage Bureau | Technical Service Contract for Generator Replacement Project of Dalian Zhuanghe Offshore HZ5000 Wind Turbine Generator Set | Large Component Replacement | February 2023 | April 2023 |
| 27 | China Railway Port Bureau Group Co.,Ltd | Underwater Cage Fastener Installation of Wind Turbines for Datang Nan'ao Lemen I Offshore Wind Power Project | Underwater Cage Fastener Installation ofJanuary4 Wind Turbines | September 2022 | September 2022 |
| 26 | Shanghai Boqiang Heavy Industry Group Co., Ltd. | Substation Upper Block Hoisting Project of Shandong Energy Bozhong Offshore Wind Power B Site Project | Substation Upper Block Hoisting | September 2022 | September 2022 |
| 25 | Huadian Heavy Industry Co., Ltd. | Wind Turbine Foundation Construction Project of Section I of CGN Jiazi No.2 Offshore Wind Farm Project | Single Pile Foundation Construction and Auxiliary Structure Installation; Steel Pile Turning, Pile Driving, Measurement, Inspection, etc. (20 Piles) | July 2022 | November 2022 |
| 24 | Hainan Runneng Marine Engineering Service Co., Ltd. | 220KV andMarch5KV Submarine Cable Laying Construction Project of Shandong Energy Bozhong Offshore Wind Power A Site Project | Submarine Cable Laying | July 2022 | December 2022 |
| 23 | Yantai Salvage Bureau | Wind Turbine Installation of Shandong Sea Area Offshore Wind Power Project (Changyi Wind Farm) | Wind Turbine Equipment Installation and Acceptance (22 Units) | May 2022 | November 2022 |
| 22 | Yantai Salvage Bureau | Wind Turbine Installation of Shandong Sea Area Offshore Wind Power Project (Bozhong A Wind Farm) | Wind Turbine Equipment Installation and Acceptance (34 Units) | May 2022 | November 2022 |
| 21 | Yantai Salvage Bureau | Wind Turbine Installation of Shandong Sea Area Offshore Wind Power Project (Bozhong B Wind Farm) | Wind Turbine Equipment Installation and Acceptance (4 Units) | May 2022 | November 2022 |
| 20 | Yantai Salvage Bureau | Foundation Installation of Shandong Sea Area Offshore Wind Power Project (Bozhong A Wind Farm) | Single Pile Foundation Construction and Auxiliary Structure Installation; Steel Pile Turning, Pile Driving, Measurement, Inspection, etc. (19 Piles) | May 2022 | November 2022 |
| 19 | Yantai Salvage Bureau | Foundation Installation of Shandong Sea Area Offshore Wind Power Project (Bozhong B Wind Farm) | Single Pile Foundation Construction and Auxiliary Structure Installation; Steel Pile Turning, Pile Driving, Measurement, Inspection, etc. (11 Piles) | May 2022 | November 2022 |
| 18 | Guangzhou Salvage Bureau | CGN Shanwei Jiazi No.2 Offshore Wind Farm - Jacket\Substation | Offshore Installation of Jackets and Blocks | May 2022 | July 2022 |
| 17 | Haiyang Branch of CCCC Third Harbor Engineering Co., Ltd. | Wind Turbine Pre-assembly and On-site Transfer Project of Section I of Offshore Main Engineering Construction of State Power Investment Shandong Peninsula South Offshore Wind Power Foundation V SiteMay00MW Project | Pre-assembly and On-site Transfer of 23 Wind Turbine Nacelles and Hubs | May 2022 | November 2022 |
| 16 | Tianjin Port and Waterway Bureau | Wind Turbine Pre-assembly and On-site Transfer Project of Section I of Offshore Main Engineering Construction of State Power Investment Shandong Peninsula South Offshore Wind Power Foundation V SiteMay00MW Project | Pre-assembly and On-site Transfer of 21 Wind Turbine Nacelles and Hubs | May 2022 | November 2022 |
| 15 | Zhenglì Marine Engineering Co., Ltd. | Wind Turbine Pre-assembly and On-site Transfer Project of Section I of Offshore Main Engineering Construction of State Power Investment Shandong Peninsula South Offshore Wind Power Foundation V SiteMay00MW Project | Pre-assembly and On-site Transfer ofJanuary3 Wind Turbine Nacelles and Hubs | May 2022 | November 2022 |
| 14 | Jiangsu Hailong Wind Power Technology Co., Ltd. | Wind Turbine Pre-assembly and On-site Transfer Project of Section I of Offshore Main Engineering Construction of State Power Investment Shandong Peninsula South Offshore Wind Power Foundation V SiteMay00MW Project | Pre-assembly and On-site Transfer ofJanuary3 Wind Turbine Nacelles and Hubs | May 2022 | November 2022 |
| 13 | Huadian Heavy Industry Co., Ltd. | Construction and Installation Section of State Power Investment Jieyang Shenquan No.1April00MW Offshore Wind Farm EPC General Contract Project: Single Pile and Substation Construction Labor Subcontract (Phase II) | Single Pile Foundation Construction and Auxiliary Structure Installation; Steel Pile Turning, Pile Driving, Measurement, Inspection, Substation Installation, etc. (13 Single Piles) | April 2022 | August 2022 |
| 12 | China Railway Port Bureau Group Co.,Ltd. | Datang Nan'ao Lemen I Offshore Wind Power Project Section 2: Wind Turbine Foundation Construction, Tower Manufacturing, Wind Turbine Installation and Construction; Labor Subcontract for Wind Turbine Defect Elimination Construction Project | Defect Elimination of Single Pile Foundations and Auxiliary Structures | April 2022 | July 2022 |
| 11 | Huadian Heavy Industry Co., Ltd. | Single Pile Driving Engineering Construction of Huaneng Cangnan No.4 Offshore Wind Power Project | Single Pile Foundation Construction and Auxiliary Structure Installation; Steel Pile Turning, Pile Driving, Measurement, Inspection, etc. (23 Piles) | 2021December | June 2022 |
| 10 | Huadian Heavy Industry Co., Ltd. | Huadian Peninsula South No.3 Offshore Wind Turbine Generator Set Equipment Installation Project | Tooling Fabrication, Acceptance and On-site Handover of Wind Turbine Equipment; Assembly of Wind Turbine Nacelles and Hubs; Installation and Acceptance of Wind Turbine Equipment (18 Units) | April 2021 | December 2021 |
| 9 | Yantai Salvage Bureau | Pile Driving Labor Subcontract for Shandong Peninsula South Offshore Wind Power Project | Single Pile Foundation Construction and Auxiliary Structure Installation; Steel Pile Turning, Pile Driving, Measurement, Inspection, etc. (11 Piles) | June 2021 | November 2021 |
| 8 | Huadian Heavy Industry Co., Ltd. | State Power Investment Shandong Peninsula South No.3 Offshore Wind Power Single Pile Foundation Construction Project | Single Pile Foundation Construction and Auxiliary Structure Installation; Steel Pile Turning, Pile Driving, Measurement, Inspection, etc. (23 Piles) | August 2021 | November 2021 |
| 7 | Yantai Salvage Bureau | Wind Turbine Installation Labor Subcontract for Shandong Peninsula South Offshore Wind Power Project | Loading and Unloading of Wind Turbine Generator Set Equipment, On-site Transportation and Storage, Wind Turbine Pre-assembly, Offshore Assembly, Testing and Coordination with Commissioning, etc. (70 Units) | March 2021 | December 2021 |
| 6 | Huadian Heavy Industry Co., Ltd. | Offshore Installation Project of Substation Blocks for Jiaxing No.2 Offshore Wind Power Project | Construction of Substation Upper Blocks | January 2021 | January 2021 |
| 5 | Guangzhou Salvage Bureau |
Monopile Foundation Construction for the Tra Vinh Offshore Wind Power Project in Vietnam |
Single Pile Foundation Construction (37 Piles) | December 2020 | August 2021 |
| 4 | Huadian Heavy Industry Co., Ltd. | Construction and Installation Section of State Power Investment Jieyang Shenquan No.1April00MW Offshore Wind Farm EPC General Contract Project: Single Pile and Substation Construction Labor Subcontract | Single Pile Foundation Construction and Auxiliary Structure Installation; Steel Pile Turning, Pile Driving, Measurement, Inspection, Substation Installation, etc. (16 Single Piles,January Substation) | August 2020 | August 2021 |
| 3 | Huadian Heavy Industry Co., Ltd. | Construction, Installation, Pile Driving and Jacket Installation of Three Gorges New Energy Guangdong Yangjiang Yangxi ShapaMarch00MW Offshore Wind Power Project | Pile Driving and Jacket Installation | October 2018 | January 2019 |
| 2 | Huadian Heavy Industry Co., Ltd. | Jacket Installation Construction of Three Gorges New Energy Guangdong Yangjiang Yangxi ShapaMarch00MW Offshore Wind Power Project | 10 Sets of Jacket Foundations and Installation | March 2019 | December 2019 |
| 1 | Huadian Heavy Industry Co., Ltd. | Three Gorges New Energy Guangdong Yangjiang Xisha BaMarch00MW Offshore Wind Power Project: Single Pile Foundation Construction Labor Subcontract | Offshore Installation and Construction Coordination ofJune Wind Power Piles | November 2019 | November 2020 |
| No. | Name of Projects | Work Details | Start Date | Completion Date | |
| 264 | COOEC - Deepwater Technology Services - Annual Agreement for Offshore Pipeline Expansion Bend Fabrication and Subsea Engineering Related Operation Auxiliary Construction Services (2nd Award) (2026-2029) | Provision of Construction Personnel for Land-Based Small Steel Structure and Expansion Bend Fabrication at Sihai Yard (2026-2029) | May 2026 | - | |
| 263 | Exclusive Agreement for Subsea Equipment Manufacturing and Testing, Special Equipment Branch of COOEC | Completion of Pipeline Fabrication & Installation, Pipe Support Installation, Equipment Installation, Small Structural Components & Fittings Installation, and Related Testing Works for All Subsea Projects | March 2026 | - | |
| 262 | Offshore Platform Production Adaptability Transformation Service for Xihu Operation Area, East China Sea - 2025 | Adaptive transformation including process optimization design, classification society review, and pipeline replacement | 2025 September | ||
| 261 | Contract for Deconsolidation and Welding Construction Service of Offshore Platform for Myanmar Zawtika 1E Project | Offshore deconsolidation and offshore welding installation of 4 sets of jackets and upper blocks | 2025 August | ||
| 260 | Limited Shanghai - 2025-2027 Temporary Maintenance Service for Platform and Terminal Pipeline Supports, etc. | Maintenance and emergency maintenance of platform and terminal pipelines, supports, etc. | 2025 July | ||
| 259 | Yard and Wharf Service Contract with Yantai Salvage Bureau | Steel structure fabrication and wharf loading work, etc. | 2025 July | ||
| 258 | Annual Agreement for Integrated Drilling Rig Maintenance and Transformation Technical Service with CNOOC Energy Technology & Services Limited | Offshore/onshore installation and dismantling of drilling rig equipment, fault repair, upgrading and transformation, hidden danger rectification, and structural renewal and transformation | 2025 July | ||
| 257 | Limited Shenzhen - Equipment Transformation Contract for Electrical System Upgrade of Offshore Oil 119 FPSO | Equipment transformation for electrical system upgrade of Offshore Oil 119 FPSO | 2025 June | ||
| 256 | PY30-1 Sewage Equipment Upgrade and Transformation Contract | Upgrade and transformation of PY30-1 sewage equipment | 2025 January | 2025 May | |
| 255 | Mud and Ash Blowing Pipeline Renewal Service for Huizhou 25-3 Platform | Renewal of mud and ash blowing pipelines for Huizhou 25-3 Platform | 2025 March | 2025 May | |
| 254 | Labor Service Contract for Steel Structure Fabrication | Labor service for steel structure fabrication | 2025 February | ||
| 253 | Subcontract for Leasing One 450-500 Ton Electric Jack for Shengbaowang O401 Project | Leasing of electric jack | 2025 January | 2025 January | |
| 252 | Technical Service Contract for Pipeline Processing Between Skids of Panyu 34-1 Compressor Unit with Shenyang Turbine Machinery Co., Ltd. | Pipeline processing between skids of Panyu 34-1 compressor unit | 2025 March | 2025 March | |
| 251 | Subcontract for Leasing One 450-500 Ton Electric Jack for O401 Project | Leasing of 450-500 ton electric jack | 2025 January | 2025 January | |
| 250 | Annual Tensioning Equipment Leasing Contract of Shengbaowang for 2025-2026 | Leasing of tensioning equipment | 2025 January | ||
| 249 | Contract for Wind Turbine Replacement and Motor Maintenance Service of Pinghuang Phase I | Wind turbine replacement and wind brake maintenance | 2025 February | 2025 May | |
| 248 | Exclusive Agreement for On-site Maintenance Service of Tanker Facilities in the Eastern South China Sea Region with Equipment Technology Company | Replacement and installation of tanker deck, production area structures, pipelines, etc. | 2024 December | ||
| 247 | 2024 Expansion Bend Prefabrication Service (II) Contract | Prefabrication and installation of expansion bends, pipeline blanking, assembly and welding | 2024 July | ||
| 246 | Baker Hughes Longkou Yulong Petrochemical Project | Rectification of remaining work of compressor module | 2024 January | 2024 October | |
| 245 | Exclusive Agreement for Thermal Hidden Danger Rectification Service in the Eastern South China Sea with Equipment Company | Assistance in drilling thermal work and scaffolding operations | 2024 April | ||
| 244 | Contract for Engineering Construction Auxiliary Service of New Pressure Reduction Production Module Project in Panyu 34-35 Gas Field Group | PY34-1 CEP platform transformation, equipment installation, structure and pipeline installation | 2023 November | 2025 May | |
| 243 | Exclusive Agreement for Procurement of Offshore and Onshore Canteen Equipment with Catering Company | Procurement of kitchen equipment | 2023 November | ||
| 242 | 2023-2026 Underwater Operation Tool Leasing Contract (1+1+1 Years) (Master Agreement) | Leasing of underwater hydraulic operation tools | 2023 August | ||
| 241 | Service Contract for Transformation of Domestic Sewage Treatment Device of HZ19-2 Platform | Transformation of domestic sewage treatment device of HZ19-2 Platform | 2022 December | 2023 July | |
| 240 | Structural Pipeline Replacement Project of Pinghu Offshore Platform | Structural pipeline replacement of Bajiaoting Platform | 2023 July | 2023 October | |
| 239 | Contract for Subcontracting Service of Dismantling Endeavour Single Point Buoy and Middle Water Buoy for Pengjin Single Point Buoy and Middle Water Buoy Dismantling of Pinghuang Phase I Wind Turbine Replacement and Motor Maintenance Service Contract | Dismantling of Endeavour single point buoy and middle water buoy | 2023 March | 2023 April | |
| 238 | Construction of Pressure Reduction and Production Increase Project in Panyu 34-35 Gas Field Group | Capacity expansion and transformation construction of production system of Panyu 34-1 Platform | 2023 March | 2023 August | |
| 237 | Upgrade and Transformation Project of Domestic Sewage Treatment Unit of Huizhou 19-2 Platform | Offshore construction of structure, piping, electrical and instrumentation, and equipment | 2022 December | 2023 April | |
| 236 | 2022-2025 Annual Agreement Project for Underwater Equipment Manufacturing and Testing | Skid-mounted work of underwater equipment manifolds | 2022 November | ||
| 235 | Prefabrication and Installation Project of Submarine Pipeline Expansion Bends for Kenli 6-1 Oilfield Group | Onshore prefabrication and offshore laying and installation of submarine pipeline expansion bends | 2022 September | 2023 April | |
| 234 | QHD32-6 Shore Power Capacity Expansion and Transformation Project | External expansion deck, process pipelines, wellhead pipelines, electrical transformation | 2021 February | 2021 December | |
| 233 | Construction Work of Lufeng 13-2 Platform Transformation Project | Offshore construction of structure, piping, electrical and instrumentation | 2020 February | 2020 December | |
| 232 | Calibration Service for Circuit Breakers and Comprehensive Protection Relays of Distribution Panels of Drilling Modules in Huizhou Oilfield | Electrical and instrumentation services | 2019 December | 2019 September | |
| 231 | Nigeria Project - Subcontracting for Single Point Steel Structure Installation and Construction | Structural construction | 2019 November | 2020 April | |
| 230 | Skid-mounted Work of Pipeline Part of Lingshui 17-2 Underwater Central Manifold Project | Underwater pipeline skid-mounted work, prefabrication, connection, installation, FAT | 2019 September | 2021 January | |
| 229 | Calibration and Testing Service for Switches and Comprehensive Protection Devices | Electrical and instrumentation services | 2019 September | 2019 November | |
| 228 | Maintenance of Pressure and Temperature Circular Chart Recorders and Other Projects | Equipment maintenance | 2019 July | 2019 September | |
| 227 | Maintenance of 1800M3 Dehumidifier | Equipment maintenance | 2019 July | 2019 September | |
| 226 | Subcontracting for Prefabrication of Structures of LH29-1 EPCI Project | Onshore prefabrication of structures | 2019 June | 2019 September | |
| 225 | Project of Adding Emergency Water Injection System to Storage Tanks of Longkou Terminal Treatment Plant | Pipeline prefabrication and installation, central control configuration and commissioning | 2019 March | 2019 September | |
| 224 | Jacket Structure Construction of HZ32-3/32-2 Jacket Repair Project | Jacket repair | 2019 April | 2019 June | |
| 223 | Maintenance and Repair of Electric Air Compressors of Installation Division of Offshore Oil Engineering Co., Ltd. | Maintenance and repair of Z19AZENS0423 electric air compressor | 2019 April | 2019 April | |
| 222 | Subcontracting for Barge Transformation of Bonan Natural Gas Recovery and Utilization Project (Phase II) | Barge transformation | 2018 December | 2019 January | |
| 221 | Air Compressor Leasing Project with Shenzhen CNOOC Engineering Underwater Technology Co., Ltd. | Air compressor leasing | 2018 October | 2018 November | |
| 220 | Overseas Construction of Saudi Arabia Project and Qatar Project | Overseas construction | 2018 September | 2019 September | |
| 219 | Construction of Maintenance of Water Injection Submarine Pipeline Riser on GCP Side from Jinzhou 9-3 GCP to WHPB Platform, Corrosion Maintenance of Luda Submarine Pipeline Landing Section of Suizhong 36-1 Crude Oil Terminal Plant, and Cement Solidification Repair Project of Single-layer Submarine Pipeline Riser of SZ36-1 CEP | Maintenance service of water injection submarine pipeline riser on GCP side from Jinzhou 9-3 GCP to WHPB Platform; Cement solidification repair of single-layer submarine pipeline riser of SZ36-1 CEP; Corrosion maintenance of Luda submarine pipeline landing section of Suizhong 36-1 Crude Oil Terminal Plant | 2018 September | 2019 October | |
| 218 | BZ28-2S CEP WHPB BOP Crude Oil System Optimization Transformation and BZ28-2S WHPB Cold Vent System Hidden Danger Treatment and Optimization Transformation Service Project | Hidden danger treatment and optimization transformation service of cold vent system | 2018 September | 2018 December | |
| 217 | Caofeidian 11-1/11-6 Oilfield Comprehensive Adjustment Project | Oilfield comprehensive adjustment project | 2018 September | 2018 October | |
| 216 | Service Project of Adding Sewage Oil Tank to DPP Platform of Luda 5-2 Oilfield | Construction of new sewage oil tank service project | 2018 October | 2019 April | |
| 215 | Service Project of Design and Transformation of Adding Cargo Lifting Deck to SZ36-1 CEPO Platform | Design and transformation of adding cargo lifting deck | 2018 June | 2018 July | |
| 214 | Offshore Auxiliary Installation Engineering of Jackets and Blocks for Dongfang 13-2 Gas Field Group Development Project | Offshore installation of jackets and blocks | 2018 June | 2018 September | |
| 213 | Zhejiang Petrochemical Mamu Yushan Submarine Pipeline Project | Submarine pipeline project | 2018 May | 2018 November | |
| 212 | Overhaul of Electrical Parts of Three Main Generators, Overhaul of Six Motors on Production Deck, UPS Upgrade and Transformation of Panel Cabinets, and Replacement, Maintenance and Repair of Instrument Valves in Production Area for Nanhai Victory FPSO Dock Repair Project | Generator overhaul, UPS transformation, instrument valve inspection and maintenance | 2018 May | 2018 November | |
| 211 | Electrical, Instrumentation, Structural and Mechanical Professional Maintenance and Transformation Project for Nanhai Victory FPSO Dock Repair Project | Electrical, instrumentation, structural and mechanical professional maintenance and transformation construction | 2018 May | 2018 November | |
| 210 | Project of Adding Turbine to WHPD Platform of Caofeidian 11-6 Oilfield | Platform new turbine project | 2018 May | 2018 October | |
| 209 | Fabrication and Installation of Equipment Bases and Inspection of Fire Doors for "Stena" Goddess Project | Fabrication and installation of equipment bases and inspection of fire doors | 2017 July | 2017 July | |
| 208 | Construction of Reserved Gas Lift Process Implementation Project of WHPD Platform for Phase II Development Project of Jinzhou 25-1 and Jinzhou 25-1 South Oilfield | Implementation of reserved gas lift process | 2017 December | 2018 December | |
| 207 | Tooling, Equipment and Operator Support Service for Fire Fighting, Rescue and Escape Maintenance and Transformation Project | Tooling, equipment and operator support service for fire fighting, rescue and escape maintenance and transformation project | 2017 December | 2018 December | |
| 206 | Construction Assistance for Weizhou 6-13 Upper Block Installation Project + Hose and Submarine Cable Laying Project for Weizhou 6-13 Oilfield Development Project | Prefabrication of water entry bridge and related structures; block installation construction | 2017 December | 2018 February | |
| 205 | Addition of Workover Office, Data Room and Meeting Room Transformation in Weizhou 12-2 Oilfield | Transformation of office, data room and meeting room | 2017 December | 2018 February | |
| 204 | CB-BUA Living Building Renovation Project | Living building renovation | 2017 September | 2018 February | |
| 203 | Remaining Work of Compressor Module for Post-phase Platform Transformation Project of Liwan 3-1 Phase I | Offshore construction of remaining work of compressor module | 2017 August | 2018 May | |
| 202 | Subcontracting for Construction Assistance of Submarine Pipeline Internal Inspection Project from Pinghuang Phase I Wellhead Platform to Huangyan 1-1 CEP | Pipeline internal inspection assistance construction | 2017 July | 2017 August | |
| 201 | Refining and Chemical Industry to Dongying Terminal Return Transportation Process Transformation Project | Pipeline process transformation | 2017 May | 2017 November | |
| 200 | Flange Protector Fabrication and Offshore Construction Cooperation for PL19-9 Oilfield Comprehensive Adjustment Project | Flange protector fabrication and offshore construction | 2017 May | 2017 August | |
| 199 | BZ26-3 Adjustment Well A13 and B8 Surface Process Facility Transformation Project | Wellhead surface process transformation | 2017 March | 2017 September | |
| 198 | 8-inch Low-pressure Water Injection Submarine Pipeline Maintenance Project of Suizhong 36-1 WHPC Platform | Submarine pipeline maintenance | 2017 March | 2017 June | |
| 197 | Offshore Installation Construction Assistance Support for WZ6-13 WHPA Jacket of Jacket Offshore Installation Project for Weizhou 6-13 Oilfield Development Project | Offshore assistance construction for jacket installation | 2017 March | 2017 March | |
| 196 | Boiler Addition and Transformation Project of SZ36-1A Platform | Boiler transformation | 2017 March | 2017 December | |
| 195 | Annual Agreement Project for Fabrication of Petroleum Equipment Manifolds, etc. with Yantai Jereh Oilfield Services Group Co., Ltd. | Fabrication of stainless steel and carbon steel manifolds for petroleum equipment, machining, etc. | 2017 January | 2017 December | |
| 194 | Onshore Dismantling Project of BSL Platform ACE Large Tank and Jacket Cap | Onshore dismantling of oil storage tank and jacket cap | 2016 October | 2016 December | |
| 193 | Thermal Insulation Inspection and Replacement of On-site Pipelines, Valves, etc. of Pinghu and Bajiaoting Platforms | Pipeline thermal insulation repair | 2016 September | 2016 October | |
| 192 | Onshore Prefabrication and Offshore Installation of Risers, Cable Protection Pipes, Trenching, Expansion Bends, Pigging and Pressure Testing, and Cement Block Placement for Overall Upgrade and Transformation Project of Chengbei Oilfield Equipment and Facilities | Onshore prefabrication and offshore installation of risers, cable protection pipes, trenching, expansion bends, pigging and pressure testing, and cement block placement | 2016 August | 2016 October | |
| 191 | Onshore Prefabrication and Offshore Construction Cooperation for Flexible Expansion Bend Replacement Construction Service Project of SLPW to WHPE Platform of Jinzhou 9-3 Oilfield | Prefabrication of expansion bends and offshore cooperation construction | 2016 August | 2016 November | |
| 190 | Comprehensive Transformation of Chengbei Oilfield Area A | Platform transformation | 2016 August | 2017 January | |
| 189 | BSL Platform Large Tank Transformation for Comprehensive Transformation of Chengbei Oilfield Area A | Oil tank transformation | 2016 June | 2016 September | |
| 188 | Contract for Fabrication of Turbine System of Jinglue Platform | Fabrication engineering of cantilever beam and drilling platform turbine system | 2016 April | 2016 January | |
| 187 | BZ28-34 Oilfield Group Regional Development Project BZ28-2-2S WHPB Platform B27 Well Wellhead Piping and Surface Process Transformation | Wellhead transformation | 2016 April | 2016 October | |
| 186 | Elbow Prefabrication Project for Second-phase Repair Project of Yacheng 13-1 Gas Field Submarine Pipeline | Elbow processing and prefabrication | 2016 March | 2016 March | |
| 185 | Freshwater Tank Relocation Construction for Pressure Reduction and Production Increase Project of BZ13-1 Oilfield | Freshwater tank relocation | 2016 March | 2016 April | |
| 184 | CEPI/CEPJ Jacket DSU Derusting and Repair Construction for Qinhuangdao 32-6 Oilfield Comprehensive Adjustment Project | DSU derusting and repair | 2016 March | 2016 October | |
| 183 | P990050673 Quenching and Tempering Skid Thermal Insulation Project of Yantai Jereh Oilfield Services Group Co., Ltd. | Thermal insulation of tanks and pipelines | 2016 March | 2016 April | |
| 182 | Construction of Mooring Bollard and Living Building Oil Skimmer Transformation Project for Phase II Development Project of JZ25-1/JZ25-1S Oilfield | Mooring bollard and living building oil skimmer transformation | 2016 February | 2016 May | |
| 181 | Platform Problem Rectification Construction of BZ34-1 Oilfield and Kenli 3-2 Oilfield Platforms | Platform problem maintenance | 2016 January | 2016 May | |
| 180 | Annual Agreement Project for Fabrication of Petroleum Equipment Manifolds, etc. with Yantai Jereh Oilfield Services Group Co., Ltd. | Fabrication of stainless steel and carbon steel manifolds for petroleum equipment, machining, etc. | 2016 January | 2016 December | |
| 179 | QK17-3 Main Engine A Inspection Service | Inspection service | 2015 December | 2015 November | |
| 178 | BZ28/34 Oilfield Group Regional Development Project BZ34-2/4 WHPB Platform Tie-back Well Installation Project Change | Tie-back well installation | 2015 December | 2016 January | |
| 177 | Construction of Cable Tray Shield Addition and Kitchen Electrical Hidden Danger Rectification Service Project for Jinzhou 20-2 Gas Field | Cable tray shield addition and kitchen electrical hidden danger rectification | 2015 December | 2016 February | |
| 176 | 286 ROV Transformation Project | Pipeline transformation | 2015 December | 2015 December | |
| 175 | Construction of Inspection or Replacement Project of 26 Defective Weld Seams Found in Special Inspection of BNT Phase I Main Process | Inspection or replacement of defective weld seams | 2015 December | 2016 February | |
| 174 | Crawler Crane and Forklift Service for Myanmar ZAWTIKA 1B Project | Leasing of 150T crawler crane and 5T forklift | 2015 October | 2016 February | |
| 173 | Emergency Generator Maintenance of Offshore Oil 226 | Emergency generator maintenance | 2015 October | 2015 November | |
| 172 | BZ28/34 Oilfield Group Regional Development Project BZ34-2/4 WHPB Platform Tie-back Well Installation | Tie-back well installation | 2015 September | 2016 January | |
| 171 | Disassembly and Assembly Construction of Domestic Sewage Device of Suizhong 36-1 WHPM Platform | Disassembly and assembly of domestic sewage device | 2015 September | 2015 December | |
| 170 | BZ26-3 Oilfield A12 Well Surface Process Pipeline Secondary Choke Downstream Process Pipeline Transformation Service Project Construction | Secondary choke downstream process pipeline transformation | 2015 September | 2016 January | |
| 169 | HY1-1 CEP Wet Gas Compressor Base Welding and Fixing Construction Service Project for Huangyan Phase II Offshore Installation Construction Project | Wet gas compressor base welding and fixing, compressor base welding and fixing | 2015 September | 2015 October | |
| 168 | Subcontracting for Offshore Installation Assistance of Jackets and Blocks for Phase II Development Project of Weizhou 12-2 & 11-4N Oilfield | Offshore installation of jacket blocks | 2015 August | 2015 September | |
| 167 | Seawater Generator Transformation Construction Subcontracting Outsourcing Service Project for Three Platforms of Wellhead Pipeline Tie-back Project of Enping Oilfield Group Development Platform | Seawater generator transformation | 2015 August | 2015 September | |
| 166 | Subcontracting for Offshore Installation Assistance of Jackets and Blocks for Phase II Development Project of Weizhou 12-2 & 11-4N Oilfield | Offshore installation assistance construction of jackets and blocks | 2015 August | 2015 September | |
| 165 | Old Platform Transformation Project for Pressure Reduction and Production Increase Project of BZ13-1 Oilfield | Old platform transformation | 2015 July | 2016 April | |
| 164 | Anti-pollution Device Fabrication and Installation Construction of CEPI/CEPJ/WHPG Platform Wellhead Area for Qinhuangdao 326 Oilfield Comprehensive Adjustment Project | Pollution device fabrication and installation | 2015 July | 2015 December | |
| 163 | Spare Parts Material Box Maintenance of Offshore Engineering Maintenance Company | Spare parts material box maintenance | 2015 June | 2015 November | |
| 162 | Pigging Pump Maintenance of Offshore Engineering Maintenance Company | Pigging pump maintenance | 2015 June | 2015 December | |
| 161 | Pressure Test Pump Maintenance of Offshore Engineering Maintenance Company | Pressure test pump maintenance | 2015 June | 2015 November | |
| 160 | BZ13-1 Old Platform Transformation for Production Increase and Pressure Reduction Project | Old platform transformation | 2015 June | 2015 June | |
| 159 | Huayanglong Z1 and Xiangyunkou Maintenance Project (Penglai Jutal Offshore Engineering Heavy Industry Co., Ltd.) | Prefabrication of Class II structural platform supports | 2015 September | 2015 November | |
| 158 | Huayanglong Z1 and Xiangyunkou Maintenance Project (Penglai Jutal Offshore Engineering Heavy Industry Co., Ltd.) | Pipeline tooling prefabrication | 2015 September | 2015 November | |
| 157 | Huayanglong Z1 and Xiangyunkou Maintenance Project (Penglai Jutal Offshore Engineering Heavy Industry Co., Ltd.) | Class III structural prefabrication and installation | 2015 July | 2015 November | |
| 156 | Construction of Corroded Member Maintenance and Replacement Project of Chengbei A/B Platforms | Maintenance and replacement of corroded members | 2015 May | 2015 July | |
| 155 | Central Air Conditioning Ventilation Noise Rectification Construction for Kenli 3-2 Oilfield Group Development Project Platform | Central air conditioning ventilation noise rectification | 2015 May | 2015 August | |
| 154 | Emergency Displacement Pump Transformation and Electric Desalting Pump Installation Construction for Kenli 3-2 Oilfield Group Development Project | Emergency displacement pump transformation and electric desalting pump installation | 2015 May | 2015 August | |
| 153 | Mechanical Oil Transfer Pump Filter Platform Transformation Project Construction of BZ35-2 Oilfield | Mechanical oil transfer pump filter platform transformation | 2015 March | 2015 June | |
| 152 | Construction of Adding Buffer Tank to RUP Water Injection Discharge Pipeline Project | Adding buffer tank to RUP water injection discharge pipeline | 2015 March | 2015 September | |
| 151 | Construction of CEPO/N Cage Deck External Expansion Construction of SZ36-1, etc. | Deck external expansion construction | 2015 March | 2015 June | |
| 150 | Subcontracting for Jacket and Block Installation of Huangyan and Surrounding Gas Field Development Project (Blue Whale) | Offshore installation of jacket blocks | 2015 March | 2015 October | |
| 149 | Pipeline Cold Insulation Construction of Panyu 34-1 Project | Pipeline thermal insulation | 2015 February | 2015 May | |
| 148 | Australia Mas and Zina Maintenance Project (Penglai Jutal Offshore Engineering Heavy Industry Co., Ltd.) | Secondary structure construction subcontracting | 2015 January | 2015 May | |
| 147 | Sandblasting and Painting Subcontracting for Wellhead Pipeline Tie-back Project of Enping Oilfield Group Development Platform | Sandblasting and painting of decks of Enping 24-2, Huizhou 25-8 and Xijiang 24-3 platforms | 2015 January | 2016 June | |
| 146 | Subcontracting for Prefabrication of Riser Clamps of Pinghuang Phase I Submarine Pipeline Project | Onshore prefabrication and welding of riser clamps and hoisting clamps | 2015 January | 2015 March | |
| 145 | Annual Agreement Project for Fabrication of Petroleum Equipment Manifolds, etc. with Yantai Jereh Oilfield Services Group Co., Ltd. | Fabrication of stainless steel and carbon steel manifolds for petroleum equipment, machining, etc. | 2015 January | 2015 December | |
| 144 | Pressurized Tapping Subcontracting for Nanshan Jet Technology Application Offshore Installation and Transformation Construction Service Project | Pressurized tapping of pipelines | 2014 December | 2014 December | |
| 143 | BZ25-1 WHPB33 Conversion Injection Pipeline Transformation and WHPB23/C06 Water Injection Well Surface Process Pipeline Transformation Project | Surface process pipeline transformation | 2014 November | 2015 January | |
| 142 | External Corrosion Repair Construction Service Project of Water-to-Gas Pipeline of Suizhong 36-1 CEP Platform | External corrosion repair of water-to-gas pipeline | 2014 November | 2015 January | |
| 141 | BZ28-2SN-A4hs Sidetrack Water Injection Process Transformation Project | Wellhead pipeline connection, thermal insulation and instrument installation | 2014 November | 2014 November | |
| 140 | Jacket Offshore Installation Support for Phase II Development Project of Weizhou 12-2 and 11-4N Oilfield | Jacket overwater installation and related auxiliary work | 2014 October | 2014 December | |
| 139 | Small Platform Facility Renovation Project of BZ28-2S Oilfield Group | Equipment thermal insulation repair | 2014 September | 2014 November | |
| 138 | Wellhead Pipeline Connection Service Project of Enping 24-2 DPP Block for Enping Oilfield Group Development Project | Wellhead pipeline connection work | 2014 August | 2015 May | |
| 137 | Expansion Bend Prefabrication and Pigging, Pressure Testing and Drainage Project of Jinzhou 9-3 Oilfield Main Body Comprehensive Adjustment General Contract Project | Submarine pipeline and expansion bend connection | 2014 August | 2014 November | |
| 136 | Service Project of Adding Production Water Treatment Device for QHD33-1 | Equipment installation, external expansion deck and equipment pipeline connection | 2014 August | 2015 February | |
| 135 | JZ20-2 Platform Offshore Demolition and Onshore Dismantling | Platform offshore demolition and onshore dismantling | 2014 July | 2015 September | |
| 134 | Huangyan Project 2-2 Jacket Installation | Jacket overwater installation and related auxiliary work | 2014 July | 2014 August | |
| 133 | Huangyan Project Shaoxing 36-5 and Huangyan 1-1 Jacket Installation | Jacket overwater installation and related auxiliary work | 2014 June | 2014 August | |
| 132 | Caofeidian Single Point Maintenance Project - Old Single Point Inspection, Old YOKE Guide Rope and New Single Point Base Pile Head Cutting Project | Single point welding inspection and pile head cutting transformation | 2014 June | 2014 July | |
| 131 | Post-trenching Construction Cooperation Project of Bozhong 28/34 Oilfield Regional Development Project | Post-trenching construction cooperation and trencher transformation | 2014 June | 2014 September | |
| 130 | Caofeidian Oilfield FPSO Heat Medium Boiler C Replacement, Installation and Commissioning | Heat medium boiler equipment hoisting and installation | 2014 May | 2014 July | |
| 129 | Onshore Prefabrication and Offshore Installation (Underwater Cooperation) Project of Risers and Riser Clamps for Bozhong 28/34 Oilfield Regional Development Project | Riser connection and installation, clamp fabrication and installation | 2014 May | 2014 June | |
| 128 | Air Compressor Leasing Project | Air compressor leasing | 2014 May | 2014 June | |
| 127 | Water Injection Submarine Pipeline Inspection Construction for QHD32-6 Oilfield Water Injection Submarine Pipeline Inspection Service Project | Riser maintenance | 2014 May | 2014 June | |
| 126 | Xijiang 24-3 Block Offshore Installation Project | Block offshore installation | 2014 May | 2014 June | |
| 125 | Enping Project DOGHOUSE Fabrication Subcontracting Project | DOGHOUSE fabrication | 2014 April | 2014 May | |
| 124 | Remaining Work Construction of Panyu 34-1 Project | Platform remaining work | 2014 March | 2015 April | |
| 123 | Huangyan Project Baoyunting and Tuanjieting Jacket Installation | Jacket overwater installation and related auxiliary work | 2014 March | 2014 May | |
| 122 | Enping 24-2 Jacket Structural Support | Jacket overwater installation and related auxiliary work | 2014 March | 2014 May | |
| 121 | Nanhai Deepwater Natural Gas Project Liwan 3-2 Deck Coating Construction, Outfitting Rectification and New Sewage Treatment Equipment System Transformation Work | Deck coating construction, outfitting rectification and new sewage treatment equipment system transformation work | 2014 March | 2015 May | |
| 120 | HYSY102 Inert Gas Generator and Heat Medium Boiler A Replacement Project | Inert gas generator hoisting and installation | 2014 March | 2014 May | |
| 119 | Suizhong 36-1 Oilfield Phase II Comprehensive Adjustment CEPO Platform Closed Drainage Pump and Sewage Oil Pump Outlet to Crude Oil System 1 Series Process Transformation Project | Crude oil process line transformation and installation | 2014 March | 2014 April | |
| 118 | SZ36-1 Phase II Adjustment Project CEPO and CEPN Process Flow Optimization Transformation Project | Process pipeline transformation | 2014 March | 2014 May | |
| 117 | JZ25-1S WHPB Platform Wind Shield Maintenance and Replacement Service Project | Platform wind shield fabrication and installation and pump body thermal insulation | 2014 March | 2014 May | |
| 116 | Yantai Jereh Oilfield Services Group Co., Ltd. Petroleum Equipment Manifold Replacement and Installation Project | Fabrication and replacement of integral manifolds for 3 cementing pump trucks | 2014 February | 2014 March | |
| 115 | Suizhong 36-1 Phase II Comprehensive Adjustment Project WHPM Platform and CEPO/N/WHPN Platform On-site Remaining Issues (Maintenance Project (CEPO/N/WHPN Platform) Engineering Construction | Fabrication and installation of structures, pipelines, thermal insulation, etc. | 2014 February | 2014 November | |
| 114 | Dongfang 11-1 Project | Jacket and conductor casing installation work | 2014 February | 2014 June | |
| 113 | QHD32-6 Century Riser Repair Project | Submarine pipeline repair | 2014 February | 2014 March | |
| 112 | Underwater Welding and Inspection Operation Research and Skill Training | Underwater submarine pipeline clamp fabrication | 2014 January | 2014 May | |
| 111 | SZ36-1 Phase II Adjustment Project CEPN Wellhead Pipeline Connection Project | Wellhead pipeline connection, thermal insulation and instrument installation | 2014 January | 2014 September | |
| 110 | Caofeidian WGPA Cable Protection Pipe and Clamp Fabrication and Installation | Cable protection pipe connection and offshore installation | 2014 January | 2014 April | |
| 109 | QHD32-6 CEPI Platform Expansion Bend Prefabrication and Construction Cooperation Project | Submarine pipeline and expansion bend connection | 2014 January | 2014 March | |
| 108 | SZ36-1 Riser Splash Zone Anti-corrosion Construction Project | Submarine pipeline splash zone pipeline anti-corrosion | 2014 January | 2014 January | |
| 107 | Suizhong 36-1 WHPC Platform Riser Repair Project Construction | Riser repair | 2014 January | 2014 March | |
| 106 | Annual Agreement Project for Fabrication of Petroleum Equipment Manifolds, etc. with Yantai Jereh Oilfield Services Group Co., Ltd.) |
|
2014 January | 2014 December | |
| 105 | SZ36-1 CEP Phase II Submarine Pipeline Riser Damaged Clamp Repair Project | Offshore repair of riser clamps | 2013 December | 2014 January | |
| 104 | BZ28-1 Youyi FPSO Inert Gas Generator Replacement Project | Offshore replacement and installation construction of inert gas generator | 2013 November | 2014 February | |
| 103 | BZ28-2S CEP Water Injection Well Optimization Transformation Project | Wellhead surface process transformation | 2013 November | 2014 January | |
| 102 | NB35-2 CEP Adjustment Well A33 Well Pipeline Transformation Project Offshore Construction | Wellhead surface process transformation | 2013 November | 2013 November | |
| 101 | Nanhai Deepwater Natural Gas Project Liwan 3-1 Project LMU and Block Offshore Installation Additional Work | Platform remaining items, deck renovation, maintenance, etc. | 2013 October | 2014 September | |
| 100 | NB35-2 CEP Adjustment Well A3 Well and Conversion Injection Well A19 Well Pipeline Transformation Project | Wellhead surface process transformation | 2013 October | 2013 November | |
| 99 | Wenchang 13-6 Offshore Installation General Contract Project Overall Construction Project | Offshore installation of jackets and blocks | 2013 October | 2014 January | |
| 98 | CFD Single Point Maintenance Project Riser Clamp Offshore Installation Project | Offshore installation of riser clamps | 2013 September | 2013 November | |
| 97 | SZ36-1 CEP Phase II Submarine Pipeline Riser Damaged Clamp Repair Project | Offshore repair construction of risers and clamps | 2013 September | 2014 January | |
| 96 | QHD32-6 Oilfield Century Single Point Water Injection Riser Repair Project Construction | Offshore repair construction of risers and clamps | 2013 August | 2013 September | |
| 95 | Panyu 34-1 MRG Module Offshore Hoisting Frame Fabrication Project | Fabrication and installation of hoisting frame, provision of supporting locks and completion of relevant inspection work | 2013 August | 2013 September | |
| 94 | Qinhuangdao 32-6 Oilfield Comprehensive Adjustment Project Intersection Handling Ship Deck Construction | Provision of construction personnel to cooperate with offshore construction | 2013 July | 2013 September | |
| 93 | JZ25-1S Export Gas Pipeline Laying Project Support and Cooperation | Pigging and pressure testing between onshore landing section of submarine pipeline and platform; Drainage, drying and inerting construction between onshore terminal treatment plant and platform | 2013 July | 2013 August | |
| 92 | Huangyan and Surrounding Gas Field Development Project Jacket Offshore Installation Project | Huangyan 14-1 jacket installation | 2013 June | 2013 July | |
| 91 | Huangyan and Surrounding Gas Field Development Project Jacket Offshore Installation Project | Installation of two jackets: Canxue and Canxuebei | 2013 June | 2013 July | |
| 90 | Nanhai Deepwater Natural Gas Project Liwan 3-1 Project LMU and Block Offshore Installation Project | Block installation | 2013 May | 2013 May | |
| 89 | BZ28-1 Youyi FPSO Inert Gas Generator Replacement Project | Offshore replacement and installation of inert gas generator | 2013 March | 2014 January | |
| 88 | Liuhua 19-5 Gas Field Development Project Panyu 30-1 Platform Piping, Mechanical and Electrical Instrument Offshore Installation Project | Offshore installation of piping, mechanical and electrical instruments | 2013 March | 2013 December | |
| 87 | Liuhua 19-5 Gas Field Development Project Temporary Hoisting Platform Offshore Installation and Dismantling Service Project | Platform offshore installation and dismantling | 2013 January | 2013 December | |
| 86 | Nanshan Base Warehouse Roof Repair and External Wall Painting Project | Base maintenance | 2013 January | 2013 December | |
| 85 | Annual Agreement Project for Fabrication of Petroleum Equipment Manifolds, etc. with Yantai Jereh Oilfield Services Group Co., Ltd. | Fabrication of stainless steel and carbon steel manifolds for petroleum equipment, machining, etc. | 2013 January | 2013 December | |
| 84 | Thermal Insulation Engineering Construction Project of Construction Design and On-site Construction Service Project for LPG Remaining Item Rectification Work | Pipeline thermal insulation | 2012 December | 2013 January | |
| 83 | NB35-2 WHPB-M-24-Air Conditioner Air Inlet Transformation Project | Air conditioner air inlet transformation | 2012 December | 2013 January | |
| 82 | LD4-2 External Well Slot and Process Supporting System Upgrade Air Compressor Relocation Project | Air compressor upgrade, transformation and relocation | 2012 November | 2012 December | |
| 81 | Weizhou 12-8W/6-12 Platform Offshore Installation, Submarine Pipeline/Submarine Cable Laying Project 12-1 PUQB Block Installation Project | Platform block welding and installation | 2012 October | 2012 December | |
| 80 | JZ25-1S WHPA Platform New Adjustment Well Surface Process Transformation Project | Surface process transformation of 8 new wells | 2012 September | 2013 March | |
| 79 | SZ36-1 Oilfield Phase II Adjustment WHPC Production Platform Construction Project New Jacket Offshore Installation Cooperation Construction Project | DOCKING frame and jacket installation | 2012 September | 2012 October | |
| 78 | Wenchang 19-1N/8-3E Oilfield Development Offshore Installation Project Air Compressor Leasing Project | Air compressor leasing | 2012 September | 2012 November | |
| 77 | Yacheng 13-4 Platform Transformation Project Thermal Insulation Engineering Construction Project | Thermal insulation engineering construction | 2012 August | 2012 October | |
| 76 | LD32-2/27-2 Oilfield Mooring Walkway Reinforcement and Maintenance Project | Replacement of handrails and gratings for mooring walkways | 2012 July | 2012 July | |
| 75 | BZ26-2 Oil and Gas Field New Fuel Gas Cooler Service Project | Cooler replacement and installation | 2012 July | 2013 August | |
| 74 | QHD32-6 New BF Platform Submarine Pipeline Protection Frame Project | Submarine pipeline protection frame installation | 2012 July | 2012 October | |
| 73 | JZ25-1 Offshore Installation Change Project Wellhead Connection Work Project A6.A22 Wellhead Connection Project | Wellhead surface process transformation | 2012 June | 2012 October | |
| 72 | JZ25-1 Offshore Installation Change Project Wellhead Connection Work Project A6.A22 Wellhead Connection Project | New A6.A22 wellhead pipeline transformation and connection | 2012 May | 2012 June | |
| 71 | SZ36-1E Platform 3 Adjustment Wells Water Injection Surface Process Transformation Project | Production process transformation of water injection wells (E48/E49/E50) | 2012 May | 2012 July | |
| 70 | BZ26-3-A3, A12 Adjustment Well Supporting Engineering Transformation Project | Wellhead pipeline transformation and connection | 2012 May | 2012 June | |
| 69 | Wenchang 19-1N/8-3E Oilfield Development Offshore Installation Project Riser and Cable Protection Pipe Clamp Prefabrication Project | Fabrication of 62 sets of underwater and overwater clamps | 2012 May | 2012 August | |
| 68 | WZ12-8/6-12 Platform Offshore Installation, Submarine Pipeline/Submarine Cable Laying Project Jacket and Block Offshore Installation Welding Project | Overall jacket installation, conductor casing installation, block installation | 2012 May | 2012 May | |
| 67 | YC13-1 Platform Pressure Reduction Production Transformation Project Thermal Insulation Project | Foam glass thermal insulation installation for refrigeration pipelines | 2012 May | 2012 May | |
| 66 | BZ26-3-A3, A12 Adjustment Well Supporting Engineering Transformation Project | Wellhead pipeline transformation and connection | 2012 May | 2012 June | |
| 65 | Nanshan Terminal Thermal Insulation Project | Thermal insulation of 15-meter-high liquid tank | 2012 April | 2012 August | |
| 64 | BZ28-1 North Platform N1 Well Choke to Manifold Pipeline Replacement Project Anti-corrosion and Thermal Insulation Construction Project | Wellhead pipeline anti-corrosion and thermal insulation | 2012 April | 2012 April | |
| 63 | NB35-2 WHPB Heat Medium Boiler Refractory Layer Repair and Flue Dust Cleaning Project | Repair of fire arches of 3 heat medium boilers on platform and dust cleaning of flues and fans | 2012 April | 2012 April | |
| 62 | JZ25-1S CEP Lifeboat Capacity Expansion Installation and Dismantling Lifeboat Relocation to JZ9-3 Platform Installation and Replacement Project | JZ25-1S CEP and JZ9-3 platform lifeboat capacity expansion and replacement | 2012 March | 2012 October | |
| 61 | LS36-1 Gas Field Development Project Gas Cylinder Rack Manifold Fabrication Project | Fabrication of 55 sets of gas cylinder racks for oxygen, mixed gas, LPG, etc., and fabrication of copper manifolds, passing CCS inspection | 2012 March | 2012 May | |
| 60 | Nanshan Terminal LPG Fine Desulfurization Equipment Installation Project Pressurized Tapping Construction Project | Pressurized tapping of pipelines below 6 inches | 2012 February | 2012 March | |
| 59 | Liuhua 4-1 Anti-settling Plate Prefabrication Project | Processing and fabrication of 10*11 meter anti-settling plate | 2012 February | 2012 March | |
| 58 | Victory No.6 Drilling Platform Overhaul Project | Pipeline replacement and transformation of various turbine systems, maintenance, replacement and installation of turbine equipment, replacement of living area floors, cable laying and equipment wiring | 2012 January | 2012 May | |
| 57 | Annual Agreement Project for Fabrication of Petroleum Equipment Manifolds, etc. with Yantai Jereh Oilfield Services Group Co., Ltd. |
|
2012 January | 2012 December | |
| 56 | Offshore Oil 102 FPSO Heat Medium Boiler B Replacement and Installation Project | Mechanical part removal of original boiler, installation of new and old boilers, assistance in commissioning, etc. | 2011 December | 2012 January | |
| 55 | BZ28-1 Youyi Heat Medium Boiler A/B Replacement and Installation Additional Project | Steam boiler removal | 2011 October | 2011 November | |
| 54 | JZ20-2 Gas Mine Fire Extinguisher and Fire Hose Box Fabrication and Installation Project | Fire extinguisher and fire hose installation | 2011 October | 2011 November | |
| 53 | JZ25-1 Oilfield Platform Post-connection Well Pipeline Connection Project | Post-connection well pipeline connection | 2011 October | 2012 July | |
| 52 | LD32-2 WHPA Wellhead Thermal Insulation Project | Wellhead pipeline thermal insulation | 2011 October | 2011 November | |
| 51 | Liuhua 11-1 FPSO Dock Repair Project | Machinery, ventilation, outfitting, thermal insulation, scaffolding erection | 2011 October | 2012 May | |
| 50 | SZ36-1 CEPK Inclined Plate Oil Separator ACD Internal Structure Transformation Project | Internal structure transformation of inclined plate oil separator A/C/D tanks | 2011 September | 2012 May | |
| 49 | LD32-2 PSP Crude Oil Main Engine Room Additional Manual Crane and Maintenance Passage Project | Additional manual crane and maintenance passage in crude oil engine room | 2011 September | 2011 October | |
| 48 | JZ25-1 Offshore Installation Change Project JZ25-1 Platform Maintenance Project | Construction of remaining work list determined by the project team | 2011 September | 2011 November | |
| 47 | 50,000-ton Semi-submersible Self-propelled Engineering Vessel "Offshore Oil 278" Stern Floating Box Moving Device Project | Stern floating box moving device | 2011 September | 2012 March | |
| 46 | NB35-2 CEP Floor Drain Unblocking and Filter Fabrication Project | Platform floor drain unblocking and floor drain filter fabrication | 2011 August | 2011 August | |
| 45 | SZ36-1 Phase I Adjustment Project CEPK and Other Platform Maintenance Projects | Low electrical tracing insulation rectification, water injection pump slide beam position rectification, damaged fender replacement, platform sewage oil pump transformation | 2011 July | 2011 August | |
| 44 | Bozhong Operation Area Air Conditioning Inspection Project | Air conditioning fault inspection and maintenance of 5 platforms in Bozhong operation area | 2011 June | 2011 September | |
| 43 | SZ36-1 CEP Platform External Well Slot EMS System Cooperation Construction Project | I/O cabinet installation, cable laying, medium voltage panel transformation, optical fiber fusion splicing and EMS system equipment cooperation commissioning | 2011 May | 2011 December | |
| 42 | Huizhou 19-2/3 Submarine Pipeline Installation Riser Clamp Fabrication Additional Project | Total processing volume of 18 tons, prefabrication of 23 sets of friction clamps | 2011 April | 2011 June | |
| 41 | Huizhou 19-2/3 Submarine Pipeline Installation Riser Clamp Fabrication | Total processing volume of 55 tons, fabrication of 22 sets of pipe clamps | 2011 April | 2011 June | |
| 40 | NB35-2 WHPB Multi-component Thermal Fluid Blowout Phase Emergency Process Transformation Project | Machinery, pipelines, electrical instrumentation, safety | 2011 April | 2011 June | |
| 39 | JZ25-1 Oilfield Post-connection Well Pipeline Connection Project | Pipeline connection of 15 post-connection wells | 2011 April | 2011 April | |
| 38 | BZ28-1 Youyi Heat Medium Boiler F-H1501A, B Replacement and Installation Project | Mechanical part removal of original boiler, offshore hoisting operation (2 times) of 2 boilers (F-H-1051A/B) (40 tons), installation, assistance in commissioning, etc. | 2011 April | 2011 November | |
| 37 | JZ25-1 Offshore Installation Change Project WHPA Platform Remaining Issue Rectification Project | Structure, pipelines, electrical instrumentation, machinery, thermal insulation | 2011 March | 2011 June | |
| 36 | LD27-2/32-2 Oilfield New Nitrogen Generator Installation and Commissioning Project | Addition of two nitrogen generators, two air compressors and one air buffer tank, and piping, instrument installation and cable laying according to design process and on-site conditions | 2011 March | 2011 June | |
| 35 | New Crude Oil Heat Exchanger Installation Project for LD5-2 Platform | Placement of the crude oil heat exchanger and installation of pipelines, electrical instrumentation, heat tracing, and other related components | 2011 March | 2011 October | |
| 34 | Ash Deposition Treatment Project for Heat Medium Furnaces of NB35-2 CEP/WHPB | Repair of furnace arches, ash cleaning, and burner commissioning for 5 heat medium boilers | 2011 February | 2011 May | |
| 33 | J710 Tank and Pipeline Thermal Insulation Project of Zhuhai Jutal Offshore Oil Service Co., Ltd. | Thermal insulation for tanks (including contact towers, flash tanks, buffer tanks, reboilers, filters, distillation columns) and related pipelines | 2011 February | 2011 March | |
| 32 | Outfitting Engineering of WZ11-14N Platform Transformation Project | Installation of HVAC air ducts, outfitting construction, and installation of fire doors | 2011 February | 2011 March | |
| 31 | Petroleum Equipment Manifold Fabrication Project (Annual Agreement) of Yantai Jereh Oilfield Services Group Co., Ltd. | Fabrication of stainless steel and carbon steel manifolds for petroleum equipment, and machining work, etc. | 2011 January | 2011 December | |
| 30 | Optimization and Transformation Project of Partial Filters in LD10-1 Oilfield | Fabrication and installation of 12 basket water filters | 2010 December | 2011 March | |
| 29 | New Standby Transformer Project for LD27-2 | Outfitting of electrical instrumentation, pipelines, transformer rooms, and electrical rooms | 2010 December | 2011 April | |
| 28 | Cargo Lifting Deck Extension Project for Z25-1S CEP, WHPA, and WHPB Platforms | Transformation and reinforcement of the deck structure | 2010 November | 2010 December | |
| 27 | Fire Hose Station Replacement Project for JZ20-2 | Replacement of 12 sets of hose stations and modification of pipelines | 2010 November | 2011 March | |
| 26 | Living Area of Super M2 Platform | Outfitting inside living area rooms (4,000 square meters) and corridors | 2010 November | 2011 April | |
| 25 | Slide Beam Modification and Temperature Increase Transformation Project for the Main Engine Room of LD32-2 | Modification, fabrication, and installation of slide beams; pipeline transformation | 2010 October | 2010 November | |
| 24 | Conductor Casing Deck and Lower Deck Laying Project for JZ25-1S | Fabrication and installation of the deck structure | 2010 October | 2010 December | |
| 23 | Deck Expansion Project for JZ25-1S Platform | Transformation and reinforcement of the deck structure | 2010 July | 2010 August | |
| 22 | Cable Laying and Connection, Frequency Converter & Transformer Installation and Commissioning Project for NB35-2B | Installation and commissioning of electrical equipment; outfitting of switch rooms and transformer rooms, installation of air conditioning and ventilation; installation of electrical heat tracing装 | 2010 June | 2010 July | |
| 21 | Wellhead Connection Project for NB35-2CEP | Connection of wellhead pipelines | 2010 June | 2010 October | |
| 20 | Fire Hose Station Relocation Project for BZ13-1 | Relocation and connection of fire hoses, and installation of pump sets | 2010 June | 2010 July | |
| 19 | EDP Deck Extension Project for SZ36-1 | Fabrication and installation of the deck structure | 2010 May | 2010 June | |
| 18 | "Youyi" (Friendship) of BZ28-1 | Maintenance of windlasses and winches | 2010 March | 2010 April | |
| 17 | Petroleum Equipment Manifold Fabrication Project (Annual Agreement) of Yantai Jereh Oilfield Services Group Co., Ltd. | Fabrication of stainless steel and carbon steel manifolds for petroleum equipment, and machining work, etc. | 2010 January | 2010 December | |
| 16 | Thermal Insulation Project for Waste Heat Boiler Installation Engineering of Zhuhai Terminal | Thermal insulation for waste heat boiler installation/heat transfer oil project | 2009 December | 2010 January | |
| 15 | New Sewage Well Pipeline Connection Project for LD27-2 | Prefabrication, installation, and thermal insulation of pipelines | 2009 December | 2010 January | |
| 14 | QHD32-6 Natural Gas Utilization Project (New Turbine Generator Project) | Fabrication and installation of structures, electrical instrumentation, and pipelines; offshore hoisting, offshore positioning, installation, and commissioning of the new turbine generator set; flushing and cleaning of lube oil pipelines | 2009 November | 2010 September | |
| 13 | M031 Project of Penglai Jutal Offshore Heavy Industry Co., Ltd. | Room outfitting construction, broadcasting system transformation, and pipeline thermal insulation | 2009 September | 2009 December | |
| 12 | Fire Pump Protection Pipe Extension Project for PL19-3 II | Pipeline connection | 2009 September | 2009 September | |
| 11 | Maintenance Project for QHD33-1 Platform | Pipeline connection and thermal insulation | 2009 September | 2009 December | |
| 10 | Victory No.5 Drilling Platform | Maintenance and installation of electrical and mechanical systems, pipelines, and HVAC system | 2009 June | 2009 July | |
| 9 | Maintenance of CAT Main Engine on the North Platform of BZ28-1S | Troubleshooting and maintenance of paralleling and cylinder liners | 2009 May | 2009 December | |
| 8 | Victory No.3 Drilling Platform | Transformation of the three-phase separation area, equipment installation, HVAC, and steel structure work | 2008 December | 2009 May | |
| 7 | Victory No.2 Drilling Platform | 40 tons of steel structure plate replacement, pipeline thermal insulation for the helicopter platform, and electrical maintenance | 2009 January | 2009 January | |
| 6 | Outfitting and HVAC Transformation Project for Yacheng 13-1 PLQ Living Platform | Outfitting transformation construction and HVAC transformation & construction for all rooms on the platform | 2008 October | 2008 October | |
| 5 | Weizhou 11-1A Platform | Fabrication and installation of riser clamps and cable protection pipes | 2008 October | 2008 October | |
| 4 | Partial Cabins and Electrical Rooms of HZ26-1 Platform in Huizhou 25-3 Oilfield | Fabrication and installation of structures, electrical systems, and outfitting | 2008 May | 2008 May | |
| 3 | Partial Cabins and Workrooms of HZ32-2 Platform in Huizhou 25-3 Oilfield | Fabrication and installation of structures, electrical systems, and outfitting | 2008 April | 2008 April | |
| 2 | Special Boring Machine for Jacket Fabrication of Penglai Jutal Offshore Engineering Heavy Industry Co., Ltd. | One set (2 units) with specifications from Φ400 to Φ1200 | 2007 July | 2007 September | |
| 1 | Overhaul of the Upper Module (Two Floors) of FPSO "Nanhai Victory" (South China Sea Victory) in Liuhua Oilfield | Pipeline work (800 meters), outfitting inside living containers, scaffolding erection (35,000 cubic meters), and painting (4,870 square meters) | 2006 July | 2006 October |
| No. | Project Name | Work Details | Start Date | Completion Date |
| 84 |
Shenyang Turbine Machinery Co., Ltd. - Labor Entrustment Contract for Skid-to-Skid Piping Construction of H3907 Compressor Unit at Xixia Compressor Station of National Pipe Network (Supplementary Agreement) |
Turbine Company Compressor Unit Piping Construction | July 2025 | August 2025 |
| 83 | Shenyang Turbine Machinery Co., Ltd. - Turbine Company Compressor Unit Piping Internal-to-External Construction | Turbine Company Compressor Unit Piping Construction | April 2025 | May 2025 |
| 82 |
Shenyang Turbine Machinery Co., Ltd. - Technical Service Contract for Oil Inspection of Panyu 34-1 Compressor Unit and Pipeline Treatment of Coupling Shield |
Oil Inspection of Panyu 34-1 Compressor Unit and Pipeline Installation of Coupling Shield | April 2025 | April 2025 |
| 81 | Shenyang Turbine Machinery Co., Ltd. - Technical Service Contract for Inter-Skid Piping Treatment of Panyu 34-1 Compressor Unit | Inter-Skid Piping Installation of Panyu 34-1 Compressor Unit | April 2025 | April 2025 |
| 80 |
Hull Structure Maintenance and Construction Above the Waterline of Huadian CIMC 01 |
Structure, anti-corrosion, ballast tank, oily water treatment, etc. | November 2022 | Decemeber 2022 |
| 79 |
Crane Maintenance Project of Huadian CIMC 01 Vessel |
Platform Crane Maintenance | November 2022 | December 2022 |
| 78 |
Voyage Repairs of Offshore Oil 285 and 287 Vessels |
Electrical, equipment, outfitting, kitchen maintenance | July 2020 | August 2020 |
| 77 |
Supplementary Agreement for the General Contract of Interior Decoration in the Living Area of Project H470 (Geng Hai No. 1) |
Interior Decoration Modification and Renovation Construction | June 2020 | July 2020 |
| 76 | R056 Project Interior Facility Maintenance Project (Victory No. 10) | Interior Decoration Modification and Renovation Construction | May 2020 | June 2020 |
| 75 |
Pipeline Replacement Project for Project R050 (Offshore Oil 282) |
Pipeline Replacement and Maintenance | March 2020 | April 2020 |
| 74 | R049 Project Interior Facility Maintenance (Victory No. 7) | Outfitting Renovation, Drilling Rig Renovation, Mud Pump DC Motor Maintenance, and Pipeline Renovation | January 2020 | April 2020 |
| 73 | Maintenance of Partial Pipeline Systems for Project R047 (Dongtai Baoji, Dongtai Baohao, Dongtai Baotian) | Whole-Ship Pipeline Commissioning of 5670 Bulk Carrier and Interior Decoration of Living Area | November 2019 | December 2019 |
| 72 | Pipeline Maintenance and Replacement Project for Victory No. 8 | High-Pressure Mud Pipeline Renovation | September 2019 | December 2019 |
| 71 | Pipeline Maintenance and Replacement Project for Victory No. 5 | Engine Room Seawater Pipeline Renovation | September 2019 | December 2019 |
| 70 | Pipeline Maintenance and Replacement Project for Bohai No. 5 | Engine Room Main Engine Cooling Water Pipeline Renovation | August 2019 | December 2019 |
| 69 | Interior Decoration Modification for Project R048 (CNPC Offshore 61 Platform) | Outfitting Renovation and Pipeline Renovation | September 2019 | December 2019 |
| 68 | Maintenance and Service Project for Nanhai Shengli Dock Repair: Overhaul of Electrical Parts of Three Main Generators, Overhaul of Six Motors on Production Deck, UPS Upgrade of Panels, and Replacement & Maintenance of Instrument Valves in Production Area | Generator Overhaul, UPS Renovation, Instrument Valve Inspection and Maintenance | May 2018 | November 2018 |
| 67 | Electrical, Instrument, Structural and Mechanical Maintenance & Renovation Project for Nanhai Shengli FPSO Dock Repair | Electrical, Instrument, Structural and Mechanical Maintenance & Renovation Construction | May 2018 | November 2018 |
| 66 | Maintenance Project for Victory No. 10 | Cantilever Moving Hydraulic Pipeline, Seawater Pipeline Renovation, High-Pressure Mud Pipeline Renovation, and Exhaust Pipeline Renovation | June 2018 | September 2018 |
| 65 | Maintenance Project for Victory No. 6 | Hydraulic High-Pressure Pipeline Renovation of Leg Lifting System | March 2018 | April 2018 |
| 64 | Upgrade and Renovation Project for Offshore Oil 982 | Heating System Piping, Cabin Insulation, Oil Tank Renovation, Glycol Tank Fabrication, and Pipeline Renovation & Installation, etc. | March 2018 | May 2018 |
| 63 | Renovation Project for New Victory No. 1 | Installation of Mud High-Pressure Pipeline and Combustion Arm Well Testing Pipeline | October 2017 | February 2018 |
| 62 | Renovation Project for Victory Operation No. 4 | Replacement of Cantilever Beam Walking Mechanism Hydraulic Hard Pipes, Integrated Hydraulic Valves, and Flexible Connection Pipes | April 2017 | June 2017 |
| 61 | "Stena" Goddess Project: Fabrication & Installation of Equipment Bases and Inspection of Fire Doors | Fabrication & Installation of Equipment Bases and Inspection of Fire Doors | July 2017 | July 2017 |
| 60 | Anti-Corrosion Zinc Block Replacement and Ballast Tank Valve Maintenance & Replacement Project for Youyi | Maintenance & Replacement of Zinc Blocks and Tank Valves | September 2017 | November 2017 |
| 59 | Maintenance Project for Victory No. 4 | Marine Engine Maintenance | April 2017 | May 2017 |
| 58 | Maintenance Project for Nanhai No. 1 | Outfitting and Pipeline Renovation | March 2017 | April 2017 |
| 57 | V-Frame Modification Project for Xingwang | V-Frame Modification | February 2017 | February 2017 |
| 56 | Maintenance Project for Shengli No. 9 | Pipeline, Interior Decoration, and Marine Engine Modification | February 2017 | July 2017 |
| 55 | Petroleum Equipment Manifold Fabrication Project for Yantai Jereh Oilfield Services Group Co., Ltd. (Annual Agreement) | Fabrication of Stainless Steel and Carbon Steel Manifolds for Petroleum Equipment, Machining, etc. | January 2017 | December 2017 |
| 54 | Special Inspection Project for Offshore Oil 981 Platform | Outfitting, Ventilation and Other Interior Decoration Fabrication, Partial Cable Electrical Maintenance, Mooring System Maintenance, Exhaust Pipe Renovation & Installation, etc. | September 2016 | March 2017 |
| 53 | Marine Engine System Fabrication Contract for Jinglve Platform | Fabrication Project of Cantilever Beam and Drilling Rig Marine Engine Systems | April 2016 | January 2016 |
| 52 | Construction of Sewage Return Transportation Renovation Service Project for Youyi | Sewage Return Transportation Renovation | March 2016 | October 2016 |
| 51 | Heat Preservation Project for P990050673 Quenching Skid of Yantai Jereh Oilfield Services Group Co., Ltd. | Heat Preservation of Tanks and Pipelines | March 2016 | April 2016 |
| 50 | Petroleum Equipment Manifold Fabrication Project for Yantai Jereh Oilfield Services Group Co., Ltd. (Annual Agreement) | Fabrication of Stainless Steel and Carbon Steel Manifolds for Petroleum Equipment, Machining, etc. | January 2016 | December 2016 |
| 49 | Pipeline Construction for CS50-12 Ship Repair Project | Disassembly and Repair of Valves and Pipelines in Lubricating Oil System, Hydraulic Oil System, Fuel Oil System, etc. for Ship Repair Project | November 2015 | April 2016 |
| 48 | Pipeline Construction for CS50-11 Ship Repair Project | Disassembly and Repair of Valves and Pipelines in Lubricating Oil System, Hydraulic Oil System, Fuel Oil System, etc. for Ship Repair Project | November 2015 | April 2016 |
| 47 | NOV Marine Engine Engineering Contract Collaboration for CS50-11 and CS50-12 Projects | NOV Marine Engine System Maintenance | November 2015 | April 2016 |
| 46 | Huayanglong Z1 and Xiangyunkou Maintenance Project (Penglai Jutal Offshore Engineering Heavy Industry Co., Ltd.) | Prefabrication of Class II Structural Platform Supports | September 2015 | November 2015 |
| 45 | Huayanglong Z1 and Xiangyunkou Maintenance Project (Penglai Jutal Offshore Engineering Heavy Industry Co., Ltd.) | Prefabrication of Pipeline Tooling | September 2015 | November 2015 |
| 44 | Huayanglong Z1 and Xiangyunkou Maintenance Project (Penglai Jutal Offshore Engineering Heavy Industry Co., Ltd.) | Prefabrication and Installation of Class III Structures | July 2015 | November 2015 |
| 43 | Australia Mas and Zina Maintenance Project (Penglai Jutal Offshore Engineering Heavy Industry Co., Ltd.) | Subcontracting of Secondary Structure Construction | January 2015 | May 2015 |
| 42 | Petroleum Equipment Manifold Fabrication Project for Yantai Jereh Oilfield Services Group Co., Ltd. (Annual Agreement) | Fabrication of Stainless Steel and Carbon Steel Manifolds for Petroleum Equipment, Machining, etc. | January 2015 | December 2015 |
| 41 | Berthing Pad and Hull Anti-Corrosion Zinc Block Replacement Project for Offshore Oil 102 | Berthing Pad Replacement | September 2014 | October 2014 |
| 40 | Manifold Replacement and Installation Project for Yantai Jereh Petroleum Cementing Pump Trucks | Fabrication and Replacement of Integral Manifolds for 3 Cementing Pump Trucks | February 2014 | March 2014 |
| 39 | Petroleum Equipment Manifold Fabrication Project for Yantai Jereh Oilfield Services Group Co., Ltd. (Annual Agreement) | Fabrication of Stainless Steel and Carbon Steel Manifolds for Petroleum Equipment, Machining, etc. | January 2014 | December 2014 |
| 38 | Petroleum Equipment Manifold Fabrication Project for Yantai Jereh Oilfield Services Group Co., Ltd. (Annual Agreement) | Fabrication of Stainless Steel and Carbon Steel Manifolds for Petroleum Equipment, Machining, etc. | January 2013 | December 2013 |
| 37 | Nanshan Terminal Heat Preservation Project | Heat Preservation of 15-Meter-High Liquid Tanks | April 2012 | August 2012 |
| 36 | Petroleum Equipment Manifold Fabrication Project for Yantai Jereh Oilfield Services Group Co., Ltd. (Annual Agreement) | Fabrication of Stainless Steel and Carbon Steel Manifolds for Petroleum Equipment, Machining, etc. | January 2012 | December 2012 |
| 35 | Project M057 of Penglai Jutal Offshore Engineering Heavy Industry Co., Ltd. | Pipeline Heat Preservation | November 2011 | April 2012 |
| 34 | Projects C052 & C055 of Penglai Jutal Offshore Engineering Heavy Industry Co., Ltd. | Heat Preservation of Cooling System Pipelines, Power Distribution Room Outfitting, and Heat Preservation | October 2011 | February 2012 |
| 33 | Dock Repair Project for Liuhua 11-1 FPSO | Machinery, Ventilation, Outfitting, Heat Preservation, and Scaffolding Erection | October 2011 | May 2012 |
| 32 | Stern Floating Box Moving Device Project for 50,000-Ton Semi-Submersible Self-Propelled Engineering Vessel "Offshore Oil 278" | Stern Floating Box Moving Device | September 2011 | March 2012 |
| 31 | Vessel Heat Preservation Project of Shenzhen Jutal Machinery Equipment Co., Ltd. | Vessel Heat Preservation Construction | September 2011 | October 2011 |
| 30 | Yard Pipeline Project of Penglai Jutal Offshore Engineering Heavy Industry Co., Ltd. | Gas Pipelines | September 2011 | October 2011 |
| 29 | Ship Maintenance Project for Singapore Dowell Schlumberger International Inc. | Equipment Installation and Pipeline Repair | September 2011 | November 2011 |
| 28 | Projects C052 & C055 of Penglai Jutal Offshore Engineering Heavy Industry Co., Ltd. | Crane Electrical Room Outfitting | June 2011 | February 2012 |
| 27 | Project M047 of Penglai Jutal Offshore Engineering Heavy Industry Co., Ltd. | Heat Preservation of Pipelines and Oily Water Tanks | February 2011 | April 2011 |
| 26 | J710 Tank and Pipeline Heat Preservation Project of Zhuhai Jutal Offshore Oil Services Co., Ltd. | Heat Preservation of Contact Towers, Flash Tanks, Buffer Tanks, Reboilers, Filters, Distillation Columns, and Related Pipelines | February 2011 | March 2011 |
| 25 | Petroleum Equipment Manifold Fabrication Project for Yantai Jereh Oilfield Services Group Co., Ltd. (Annual Agreement) | Fabrication of Stainless Steel and Carbon Steel Manifolds for Petroleum Equipment, Machining, etc. | January 2011 | December 2011 |
| 24 | "Aiyin" 30,000-Ton Cargo Ship | Whole-Ship HVAC and Interior Outfitting Renovation | June 2010 | October 2010 |
| 23 | Qingdao Shipyard | Prefabrication of New Workshop and 160T Crane Steel Structures | April 2010 | July 2010 |
| 22 | Petroleum Equipment Manifold Fabrication Project for Yantai Jereh Oilfield Services Group Co., Ltd. (Annual Agreement) | Fabrication of Stainless Steel and Carbon Steel Manifolds for Petroleum Equipment, Machining, etc. | January 2010 | December 2010 |
| 21 | Deck Restoration Project for "Record" Ship | Deck Timber Restoration | December 2009 | January 2010 |
| 20 | Italian Ship Equipment Co., Ltd. | Repair and Assembly of Pipe-Laying Vessel Conveying Equipment | November 2009 | February 2010 |
| 19 | Launching Barge "Defu No. 1" of Yantai Raffles Offshore Engineering Co., Ltd. | Ship Outfitting, All Electrical Instrument Maintenance, Pipeline Replacement for Renewal Projects, and Valve Lapping & Maintenance | October 2009 | October 2009 |
| 18 | Xigang Liquid Chemical Terminal of Yantai Port Authority | 12,000 Meters of Liquid Conveying Pipelines | September 2009 | February 2009 |
| 17 | Project M031 of Penglai Jutal Offshore Heavy Industry Co., Ltd. | Room Outfitting Construction, Broadcasting System Renovation, and Pipeline Heat Preservation | September 2009 | December 2009 |
| 16 | 10,000-Barrel Asphalt Barge | Electrical Engineering | October 2008 | May 2009 |
| 15 | Repair of 500T Floating Crane at Yantai Port | Hull and Electrical Renovation | April 2009 | April 2009 |
| 14 | Semi-Submersible No. 7 Engineering Vessel of Tianjin Waterway Bureau | Hull Steel Structure Renovation Project, Equipment Installation, and Electrical Maintenance | April 2009 | May 2009 |
| 13 | Special Boring Platform for Jacket Fabrication of Penglai Jutal Offshore Engineering Heavy Industry Co., Ltd. | One Set (2 Units) with Diameter Φ400-Φ1200 | July 2007 | September 2007 |
| 12 | German 600-Container Ship | Hull Fabrication (3,200 Tons) | February 2007 | January 2008 |
| 11 | German 600-Container Ship | Pipeline Fabrication & Installation and Equipment Installation | July 2007 | May 2008 |
| 10 | Floating Dock | Steel Structure (600 Tons) | April 2006 | December 2007 |
| 9 | Overhaul of Upper Modules (Two Floors) for Liuhua Oilfield FPSO "Nanhai Victory" | Pipelines (800 Meters), Interior Outfitting of Living Containers, Scaffolding Erection (35,000 Cubic Meters), and Coating (4,870 Square Meters) | July 2006 | October 2006 |
| 8 | German 600-Container Ship | Hull Fabrication (2,600 Tons) | April 2006 | December 2006 |
| 7 | German 600-Container Ship | Partial Hull Fabrication (1,400 Tons) | October 2005 | April 2006 |
| 6 | 200T Gantry Crane of Penglai Bohai Shipbuilding Co., Ltd. | Partial Steel Structure Fabrication (280 Tons) | October 2005 | November 2005 |
| 5 | 3,500-Ton Cargo Ship "Xinshan" of Yantai Jinhaiyang International Management Co., Ltd. | Hull Plate Replacement and Partial Pipeline Maintenance | October 2005 | November 2005 |
| 4 | 3,000-Ton Cargo Ship "Shenghua" of Yantai International Shipping Co., Ltd. | Shaft and Rudder System Maintenance | September 2005 | September 2005 |
| 3 | Two German 366-Container Ships | Engine Room Pipeline Fabrication & Installation | April 2005 | September 2005 |
| 2 | Two 7,000-Ton Water Barges of CNOOC Limited | Partial Hull Fabrication (870 Tons) | February 2005 | September 2005 |
| 1 | Two 1800HP Full-Rotation Rudder Propellers of Yingkou Port | Maintenance and Installation | May 2004 | May 2004 |